LinkedIn↗ GitHub↗ San Francisco · --:--
← back

Case study

Generative AI Video

A generative-video toolkit for marketers: choose a template, write the script once with placeholders, and render a personalized video for every recipient.

Role
Founding Product Designer
Company
Gan.ai
Year
2021 – 2022
The Gan.ai home screen: a prompt bar asking What would you like to create today, with a field to describe the topic, tone and audience, format and avatar controls, and a Bring it to life button.

Gan.ai turns one video into thousands: a marketer records once, and the platform renders a personalized version for every recipient - their name, their company, spoken and on screen. I joined as the first designer and owned the product from prototype to Fortune 500-scale pilots, through the $5.25M seed round.

The piece here is templates: the starting point that decides whether a marketer ships a campaign in an afternoon or gives up on it. A template is a whole video - avatar, script, scenes, music, subtitles - where anything can become a variable, so one recording turns into a thousand personal sends.

The walk

The editor

One canvas for the whole video

Everything sits on one screen: the preview on the left, the script on the right, the scene controls underneath. The script reads like a message, not a timeline — “Dear @client” is the whole personalization model, visible at a glance.

The template editor: an avatar presenter beside a product card, a script reading Dear @client with @bought product placeholders, a scene timeline and a Generate button.
The template editor.

Variables

Anything on screen can become a placeholder

Select an image, a name, a product card and turn it into a variable. At render time each recipient's data fills it in — their name in the avatar's mouth, their purchase on screen. This is the mechanic that turns one video into thousands.

An image element selected inside a template with a toolbar offering Replace image, Turn into a variable and Animate.
Turn any element into a variable.

Scenes

Long videos stay editable

Templates break into scenes, each with its own timing and transition — slide in, slide out, fade. A marketer rearranges the story without ever touching footage.

A scene timeline with three scenes, per-scene durations and slide-in and slide-out animation controls.
Scene timeline and animations.

Avatars

Pick the face that fits the brand

A stock avatar library with search and category filters, plus the option to create a custom avatar from the marketer's own recording. Swapping the presenter never means re-recording.

The Replace avatar picker: a grid of named stock avatars with All, Business and Lifestyle filters, search, and a Create Avatar tile.
Replace avatar.

Voice

Write it, hear it, change it

The script drives a generated voiceover. Teams preview the read, change the voice, or record their own audio — inline, without leaving the scene.

A scene card with the script, a Type @ to add variables hint, and Change voice and Preview audio actions.
Script and voice in one card.

Music

A soundtrack, an upload away

Background music takes an MP3, MP4 or WAV straight from the desktop and applies across the video, so a campaign does not stall on sourcing audio.

An Upload music dialog with a drag-and-drop zone accepting MP3, MP4 and WAV files up to 5MB.
Background music upload.

Media

Their own assets, or stock

The media library holds a workspace's uploads with a visible quota, and builds Unsplash and Giphy in, so the right campaign image is never more than a search away.

The media library: Your uploads with space usage, Unsplash and Giphy integrations, and a drag-and-drop zone.
Media library.

Subtitles

Readable by default

Subtitle styling is a designed system, not an afterthought: typeface, weight, size, shadow and background, plus a highlight that follows the spoken word — the difference between captions people read and captions people skip.

The Change subtitle design dialog: typography controls, text background, shadow, and a highlight-spoken-word toggle with text and background colors.
Subtitle design.

Design system

Dark for making, light for managing

The editor is a dark room; the library is a light desk. My videos runs the same system in light mode — every project and render with its status on the card, and the next action beside it: copy the link, see details, retry. One language, two surfaces.

The Gan.ai main screen in dark mode: the project dashboard with the videos library, per-video statuses and creation tools in the sidebar.
The main screen, in the dark theme.

Render

Honest waiting

Generation takes minutes, and the screen says so: what is happening, how long is left, and explicit permission to leave — the video keeps processing in the background.

The generation state: a spinner with Placing your images and videos, an estimated time remaining, and a banner saying the video continues processing in the background.
Generation, with an ETA.

Templates

A starting point for every audience

Stock templates gave every team a running start: forty presenters across ages, industries and styles, filterable by the audience the video has to convince. A campaign for a bank and a campaign for a bakery both find a face that fits, and the template carries the script, scenes and styling with it.

The Gan.ai stock templates gallery: a grid of forty AI presenter templates spanning professions, ages and styles, with filters for gender, style and context.
Forty stock templates, filterable by audience.
The Gan.ai dashboard: creation tools for cinematic ads, personalized projects and avatar videos, with projects and credits tracked in the sidebar.
The dashboard every project starts from.

What it added up to

Templates became the front door of the product: the first surface a new user touched, and the thing pilots scaled on. The walk above is the whole loop - prompt, editor, variables, scenes, avatar, voice, music, media, subtitles, render - designed end to end as the company's first designer, from the prototype to the pilots that carried the seed round.